Interstate 29 between mile markers 0.8 and 3.2 in Iowa that has had one lane open in each direction is scheduled to resume the normal two lanes in each direction on Friday, Nov. 18, the Iowa Department of Transportation announced.
This section of I-29 was severely damaged by Missouri River flooding and was closed to all traffic during the summer.